KDY·04
STAR CHARTS
KL
NAV/ENG

Outer Rim Survey Program

Nine chart teams are surveying hyperlane conditions from the Corellian Trade Spine out to the edge of Wild Space. Progress is ahead of plan, but two nav beacons still need calibration before storm season closes the Batuu approach.

SNS/IDX
Systems charted128+12 this week
Survey teams9no change
Corridor coverage87%+3.4
RNG/WKLY
Transits logged — Batuu approach
SEC/RPT

Survey notes — cycle 12

The Rimma Trade Route resurvey closed three days early. Chart teams credit the new beacon placement at the Sullust relay, which held signal through the ion-storm cycle and let the mapping droids finish two full passes in a single window.

Supply rotation remains the limiting factor. The outer beacons burn through calibration kits faster than the Lothal depot can restock them, and the review board has asked for a consumption forecast before approving the next requisition.

“We chart at the speed of our slowest beacon. Fix the beacons, and the chart draws itself.” — Chief navigator, Survey Six
SITE/STAT

Active beacons

LOG/SVY

Route log

RouteNavigatorStatusUpdated
Corellian RunD. AntillesCharted07-14
Kessel RunK. TicoInterdicted07-13
Hydian WayM. SindianSurveying07-16
Perlemian Trade RouteT. EmattScheduled07-12
REQ/CAL

Request calibration

CMP/REF

Component states

Active Pending Blocked Archived
Lothal depot restock — 64%
CONFIRM
Requisition approved — depot forecast updated.