STAR CHARTS
KL

Outer Rim Survey Program

Nine chart teams are surveying hyperlane conditions from the Corellian Trade Spine out to the edge of Wild Space. Progress is ahead of plan, but two nav beacons still need calibration before storm season closes the Batuu approach.

Systems charted128+12 this week
Survey teams9no change
Corridor coverage87%+3.4
Transits logged — Batuu approach

Survey notes — cycle 12

The Rimma Trade Route resurvey closed three days early. Chart teams credit the new beacon placement at the Sullust relay, which held signal through the ion-storm cycle and let the mapping droids finish two full passes in a single window.

Supply rotation remains the limiting factor. The outer beacons burn through calibration kits faster than the Lothal depot can restock them, and the review board has asked for a consumption forecast before approving the next requisition.

“We chart at the speed of our slowest beacon. Fix the beacons, and the chart draws itself.” — Chief navigator, Survey Six

Active beacons

  • Batuu Approach Beaconcalibrated · 2h ago
  • Lothal Depot Relayawaiting parts · 1d ago
  • Christophsis Waypointmapping · 4h ago
  • Dantooine Outpostscheduled · 3d

Route log

RouteNavigatorStatusUpdated
Corellian RunD. AntillesCharted07-14
Kessel RunK. TicoInterdicted07-13
Hydian WayM. SindianSurveying07-16
Perlemian Trade RouteT. EmattScheduled07-12

Request calibration

Component states

Active Pending Blocked Archived
Lothal depot restock — 64%
Requisition approved — depot forecast updated.